Design
Design
EEC Environmental (EEC) has experience in all aspects and stages of stormwater design. We begin with taking the client through an alternatives analysis. This process identifies all the options for Best Management Practices (BMPs) that would meet their Total Maximum Discharge Limitations (TMDL) requirements and the associated capital and operational cost for each of the identified BMPs. From this list, they can select the BMP that works best with their operations and is most cost-effective.
The result of the alternatives analysis is a 30% design of the selected option. EEC then takes the selected option through the full design process to include the preparation of a bid package and identification of all applicable permit requirements. EEC works with several preferred stormwater construction companies and can assist with the selection of the best choice for each project.